With designed landfill leachate processing capacity of 350t/d, by innovatively combining landfill with leachate incineration, this Project effectively solved the problems of poor biodegradability, high salt content, and great complexity of landfill sewage water.
Using the most cutting-edge “physical pretreatment + biotreatment + in-depth treatment technology, the water will only be discharged after the leachate has reached the most strict waste discharge standard (GB16889-2008 Form 3).